The U.S. State Department’s Bureau of Overseas Buildings Operations (OBO) has selected six design firms in Part One of its two-stage selection process for the building of the new U.S. Embassy Compound in Brasilia, Brazil.
The firms on the shortlist are Diller; Scofidio and Renfro; Morphosis Architects; Pelli, Clade, Pelli Architects; Rafael Vinoly Architects; Steven Holl Architects; and Studio Gang Architects. Originally, 48 firms were accepted for consideration for the project.
In the second stage of the selection process, the shortlisted firms will assemble their technical teams and submit qualifications for evaluation.
OBO’s mission is to provide safe, secure and functional facilities that represent the U.S. government to the host nation and support staff in the achievement of U.S. foreign policy objectives. These facilities represent U.S. values and the best in U.S. architecture, engineering, technology, sustainability, art, culture and construction execution.
More Stories
- STACKPATH: Expands Edge Footprint In Latin America
- YADEA: Scoots into Swiss and Latin American Markets with Several Brand-New Flagship Stores
- SKY POSTAL: The Billion-Dollar Misunderstanding: Ecommerce Merchants and Latin America
- IATA: Vaccines for aviation workers in Latin America
- TRITON DIGITAL: Releases the November 2020 Latin America Podcast Report
- NRDC: Latin America’s 2020 Climate Leaders and Laggards
- Tarima brings Latin music flavor to DishLATINO
- COMSovereign's DragonWave-X Signs Latin America Distribution Agreement with RF Engineering & Energy Resources for Telecom 'Any Haul' Radios for Tier-1 Operators
- IRRAS: Announces Expansion of IRRAflow Launch to Latin America
- LATIN TRADE: Publishes first edition of the World Trade Center (WTC) Prime Office Index Latam