Brazil's Gamesa received an order from Votorantim Energy to supply, transport, install and commission 98 G114-2.0 MW turbines at seven wind farms in Piau, a state in northeast Brazil, by the end of 2017.
The new turbine model has been widely accepted in Brazil, where 500 of the company's G114-2.0 MW models currently are in operation across the country. The turbines are equipped with Gamesa's MaxPower technology, which increases output from 196 MW to 205.8 MW and improves nominal capacity from 2.0 MW to 2.1 MW. The cutting-edge technology also helps the turbines produce more energy with a lower cost.
Gamesa also will be responsible for the maintenance of the seven wind farms through 2020.
More Stories
- STACKPATH: Expands Edge Footprint In Latin America
- YADEA: Scoots into Swiss and Latin American Markets with Several Brand-New Flagship Stores
- SKY POSTAL: The Billion-Dollar Misunderstanding: Ecommerce Merchants and Latin America
- IATA: Vaccines for aviation workers in Latin America
- TRITON DIGITAL: Releases the November 2020 Latin America Podcast Report
- NRDC: Latin America’s 2020 Climate Leaders and Laggards
- Tarima brings Latin music flavor to DishLATINO
- COMSovereign's DragonWave-X Signs Latin America Distribution Agreement with RF Engineering & Energy Resources for Telecom 'Any Haul' Radios for Tier-1 Operators
- IRRAS: Announces Expansion of IRRAflow Launch to Latin America
- LATIN TRADE: Publishes first edition of the World Trade Center (WTC) Prime Office Index Latam