Gamesa to supply 98 turbines for seven wind farms in Piau, Brazil

Contributed photo
- Contributed photo
0Comments

Brazil’s Gamesa received an order from Votorantim Energy to supply, transport, install and commission 98 G114-2.0 MW turbines at seven wind farms in Piau, a state in northeast Brazil, by the end of 2017.

The new turbine model has been widely accepted in Brazil, where 500 of the company’s G114-2.0 MW models currently are in operation across the country. The turbines are equipped with Gamesa’s MaxPower technology, which increases output from 196 MW to 205.8 MW and improves nominal capacity from 2.0 MW to 2.1 MW. The cutting-edge technology also helps the turbines produce more energy with a lower cost.

Gamesa also will be responsible for the maintenance of the seven wind farms through 2020.



Leave a Reply

Your email address will not be published. Required fields are marked *

Related

Santiago Peña President REDIEX

Rediex supports Paraguayan export sector at Agrodinámica 2025

Rediex’s Export Support Directorate took part in the 29th Agrodinámica fair, held from December 2 to 6 in Hohenau, Itapúa.

Jorge Antonio Jácome Pólit General Manager at Corporación Eléctrica del Ecuador Corporación Eléctrica del Ecuador (CELEC)

CELEC announces scheduled maintenance at Durán substation on December 7

This Sunday, December 7, 2025, Corporación Eléctrica del Ecuador (CELEC EP), through its Transelectric business unit, will conduct scheduled maintenance at the Durán substation in Guayas province.

Marcos Galperin Chief Executive Officer MercadoLibre

Mercado Libre raises $750 million through oversubscribed bond offering

Mercado Libre has announced the successful issuance of its 2033 senior unsecured notes, raising USD 750 million.

Trending

The Weekly Newsletter

Sign-up for the Weekly Newsletter from Latin Business Daily.